 While year-long upgrading work to its existing facilities was in progress, the club required a high specification changing facility – four changing rooms with showers and toilets in a high performance Plastisol finish.

 This unit was manufactured in our factory over a two-week period, with one week to install the unit and prepare it for use, and a further three weeks on site for all the completion works. Extra
time was taken to install specialised heat-controlled shower units to our client’s high specification. This project was designed by us in collaboration with the football club to ensure their satisfaction.

 

 From start date to possession,

 the work was completed in just eight weeks.

 Another successful project

 carried out by the MRC  workforce.

 

 

 

 

Derbyshire County Council,

William Allitt School,

Swadlincote

 

 A four-classroom music suite with toilet facilities, to include an additional tarmac parking area, and concrete and brick ramps for disabled access – this was the County Council’s demanding brief, made even more demanding by the requirement for completion within eight weeks.

 To enable the school to use the music suite whilst the above installation was taking place, we also provided a further four classroom unit on a temporary hire basis – both projects conforming to all relevant building control requirements and providing specialist sound-proofing and wall boarding.

 The speed and flexibility of the
MRC system enabled us to complete the project on time and to our clients’ satisfaction.